Federal Express (FedEx) operated their Subic Hub Complex from 1996 to 2008. Because hub operations are 24/7, no power outages can be tolerated so they commissioned CZ Engineering to design, supply and install a suitable emergency power system capable of running their systems at 100% load. CZ Engineering came up with an elegant solution and installed 3 x 750KVA turbo-diesel generators controlled by a synchronizing panel which can respond to an outage in 7 seconds. |
Home >