Home‎ > ‎

Tipo Road

When the TIPO ROAD expressway was being built, CZ Engineering was tapped to quickly re-route the affected portions of the existing US Navy's 24" sweet-water pipeline and the 13,800 volt MV primary line. Since the area is very remote and inaccessible to vehicles, we had to resort to "creative" means to move the heavy CI pipes. (i.e., carabao power)

CZ's Engr Cristobal and Engr Duero


The Crew with the 24" CI pipes

The last piece of the 24" CI pipe ready to be welded in place



Comments