When the TIPO ROAD expressway was being built, CZ Engineering was tapped to quickly re-route the affected portions of the existing US Navy's 24" sweet-water pipeline and the 13,800 volt MV primary line. Since the area is very remote and inaccessible to vehicles, we had to resort to "creative" means to move the heavy CI pipes. (i.e., carabao power) |
Home >